Canal Area Finished?

I was pleased with the results of the canal basin rebuilding, but the area the other side of the warehouse left much to be desired!

In the end, the best solution seemed to be to build yet another low relief warehouse to fill the space.

1610-025-industrial-area

There will be a buffer stop at the end of that siding as soon as Ebay deliver!

1610-031-canal-basin-and-industrial-area

Canal Basin Reworked

I was never fully happy with the canal basin, so have spent the last week or two redesigning and rebuilding the entire area.

This is the area with no buildings:

1610-006-canal-basin-rebuilding-boards

A low relief warehouse and a new custom warehouse with an angled tunnel through it has been built. In this photo, the platform hasn’t been finished:

1610-003-canal-basin-rebuilding

This is the platform finished off, with some lights in the main warehouse:

1610-014-canal-basin-rebuilding

On the other side of the main warehouse, the far siding has been cut back, and more low relief warehouses have been added:

1610-012-canal-basin-rebuilding

This is an overall view of the area:

1610-013-canal-basin-rebuilding

As with all these things, there is still much to be done, but at least the core stuff is now place.