Goods Yard

Work has finally started on the Goods Yard. The track has been fixed down, and cardboard added around the tracks to raise the level slightly:

Goods Yard 1

This is an experiment using air dried clay to fill in the gaps. Tucked in the top right hand corner of this photo is a ground shunting signal to control access to the main line:

Goods Yard 2

 

Leave a Reply