These buildings were made a while ago, but only now that the Narrow Gauge track is in place, have been lit and fitted. On the other side of the viaduct is a small office:
Almost all of the Narrow Gauge track has now been laid on a ‘cinder’ base
The only bit to be done is around the front of the station – the rails here need setting into the ‘road’ surface, and I’m still working out how to do that!