The track and wiring for the main station and the goods yard are now all in place, and the point motors have been wired to the driver cards. Mimic panel next…
News from the Wheeler Model Railway
The Wheeler Model Railway, started November 2011
The track and wiring for the main station and the goods yard are now all in place, and the point motors have been wired to the driver cards. Mimic panel next…
This is the first draft of the mimic panel layout. The large red circles are the buttons to change the points, the small red circles are red LED’s to indicate point settings, and the yellow LED’s will (eventually) show when a train is present on each section.
The plan is to mount this just under the window.
I finally installed a length of conduit under the “narrow” section, to (hopefully) invisibly carry the wires between the sections of layout. Unfortunately, I’d not fully decided how to do this BEFORE making the narrow section, so it was three times the work after…
Most of the points and track for the goods yard has now been fitted. This is probably the most complicated bit of track laying, but unfortunately had to be done first…
The track is laid on 1/16″ cork sheet – this hides the holes for the point motors and make the trains run much quieter. Eventually, ballast will be glued on the cork, so little of it will be visible.