The station area has been rearranged, and the new Bike Shelter constructed:
The toilet is now on the other side of the station, and the kiosk has been moved:
News from the Wheeler Model Railway
The Wheeler Model Railway, started November 2011
Work has continued on the Station Forecourt. On the left side of the station,there is now a garage and a small newspaper kiosk:
and on the right hand side, a traditional toilet:
(the Ladies one is inside the station, before you ask!)
The area around the narrow gauge track up to the tunnel has also been improved:

As the track layout has now changed, the existing mimic panel was out of date. It needed rebuilding anyway, so it was easier to start from scratch with a new panel. This panel also shows the state of all of the layout signals.
This uses a sandwich of 2 sheets of 3mm clear Acrylic sheet with the printed layout between them. The holes for the lights are just drilled in the rear sheet, with holes for them cut out in the paper.
The new panel fits into the same wooden frame on the windowsill that the old one used.
As the track around the main station has changed, the platforms needed to be rebuilt.
These use a different method, with a 6mm MDF base under the top of the platforms – this makes it easy to fix lights and other platform furniture.
Once the framework was built, it can be covered with laser printed bricks and stones:
I’ve realised for some time that the layout of the tracks leading to the main station isn’t ideal, and two of the platforms were far too short.
So the track layout has been changed.There is now just a single track leading to the main station.
Should have been simple, but it’s always more difficult changing things after the layout is built!
Lots of (re)work needed for the scenery though.
Work has finally started on the Goods Yard. The track has been fixed down, and cardboard added around the tracks to raise the level slightly:
This is an experiment using air dried clay to fill in the gaps. Tucked in the top right hand corner of this photo is a ground shunting signal to control access to the main line: