Halt to Tunnel Ballasted

The tracks from the halt to the tunnel have now been ballasted:



The adjacent wall has now been capped (which helps to hide the damage to the top of the wall that has occurred over the years!):


The next job will be to replace the backscenes along this section…

 

Leave a Reply