The new tracks for the main station platforms have now been installed and the buildings put back:
The track will need ballasting, but that’s a job for another day:
The station is rather full of trains as the next bit of track to be updated is being lifted!
As a reminder, this was the view during reconstruction:
and with the platform tracks positioned, but not trimmed or glued down: